The Process

Liquid surfaces such as polyaspartic garage floors, countertops, and shower walls undergo a meticulous process to ensure a durable and aesthetically pleasing finish. The preparation phase takes approximately 2-3 hours, involving taping of perimeters, thorough cleaning, and sanding of surfaces to create a suitable base for coating. Following this, the application phase of the coating process takes about 3-4 hours to ensure an even and smooth layer is achieved. Once applied, the surfaces require 24 hours of drying time to properly cure. After drying, the surfaces are re-sanded to remove any imperfections. A top coat is then applied, which again necessitates another 24 hours of drying. Finally, the last step is a thorough polishing of the surface to enhance its shine and durability.